Steelwork up at Leeds College of Music!

gg-lcom-site-progress.jpg

Things are taking shape as the construction of LCOM's new rooftop extension is underway.The design proposal consists of a rooftop extension and refurbishment at third floor level in order to extend the existing foyer facilities for ‘The Venue’ at Leeds College of Music. To read more about this project click here